Coolglass Wind Farm SID Application
Coolglass Wind Farm Limited is applying for planning permission for a development consisting of up to 13 wind turbines and associated infrastructure. The proposed wind farm is located approximately 11km southeast of Portlaoise, 14km northwest of Carlow and 11km east of Abbeyleix.
Following consultations pursuant to Section 182E of the Planning & Development Act 2000 (as amended), An Bord Pleanála determined that the proposed development is Strategic Infrastructure Development within the meaning of Section 182A of the Act which necessitates a planning application being made directly to An Bord Pleanála.
It is a requirement of the Board that the applicant creates a specific website to include all of the application documentation.
Application Form
Drawings
- Site Location Plan - Key Plan
- Site Location Plan - 1:50,000
- Site Location Plan - 1:10,000
- Site Location Plan 1 of 17
- Site Location Plan 2 of 17
- Site Location Plan 3 of 17
- Site Location Plan 4 of 17
- Site Location Plan 5 of 17
- Site Location Plan 6 of 17
- Site Location Plan 7 of 17
- Site Location Plan 8 of 17
- Site Location Plan 9 of 17
- Site Location Plan 10 of 17
- Site Location Plan 11 of 17
- Site Location Plan 12 of 17
- Site Location Plan 13 of 17
- Site Location Plan 14 of 17
- Site Location Plan 15 of 17
- Site Location Plan 16 of 17
- Site Location Plan 17 of 17
- Site Layout - Key Plan
- Site Layout Plan 1 of 6
- Site Layout Plan 2 of 6
- Site Layout Plan 3 of 6
- Site Layout Plan 4 of 6
- Site Layout Plan 5 of 6
- Site Layout Plan 6 of 6
- Typical Turbine Evelations
- Typical Turbine Foundations
- Crane Hardstanding Details
- Met Mast Layout
- Met Mast Foundation Details
- Temporary Construction Compound 1
- Temporary Construction Compound 2
- Permanent Substation Layout
- Permanent Substation Elevations
- Permanent Substation Compound Cut-Fill Sections
- Control Building Layout
- IPP Control Building Layout
- Typical Gate & Fencing Details Layout
- Typical Drainage Details 1 of 4
- Typical Drainage Details 2 of 4
- Typical Drainage Details 3 of 4
- Typical Drainage Details 4 of 4
- Typical Road Construction Details
- Typical Track Drainage Layout
- Typical Cable Trench Details
- Typical HV Joint Bay Details
- Typical MV Joint Bay Details
- Typical Drainage Details Layout
- Typical Water Crossing
- Proposed Borrow Pit
- Turbine Delivery Route Assessment Node 1-2 H024
- Turbine Delivery Route Assessment Node 1-2 H045
- Turbine Delivery Route Assessment Node 1-2 H048
- Turbine Delivery Route Assessment Node 3 H051
- Turbine Delivery Route Assessment Node 4 H007
- Turbine Delivery Route Assessment Node 4 H054
- Turbine Delivery Route Assessment Node 4 H090
- Turbine Delivery Route Assessment Node 5 H037
- Turbine Delivery Route Assessment Node 5 H057
- Turbine Delivery Route Assessment Node 6 H063
- Turbine Delivery Route Assessment Node 7 H066
- Turbine Delivery Route Assessment Node 8 H069
- Turbine Delivery Route Assessment Node 9 H072
- Turbine Delivery Route Assessment Node 10 H075
- Turbine Delivery Route Assessment Node 11 H078
- Turbine Delivery Route Assessment Node 12 H081
- Turbine Delivery Route Assessment Node 13 H084
- Overview of Turbine Delivery Route
Planning Report
Site Notice
Volume 1 - Non-Technical Summary
Volume 2 - Chapters
- Chapter 1 - Introduction
- Chapter 2 - Scoping & Key Issues
- Chapter 3 - Description of Proposed Development
- Chapter 4 - Planning Policy & Guidance
- Chapter 5 - Population & Human Health
- Chapter 6 - Air Quality & Climate
- Chapter 7 - Landscape & Visual
- Chapter 8 - Land, Soils & Geology
- Chapter 9 - Water
- Chapter 10 - Noise
- Chapter 11 - Cultural Heritage
- Chapter 12 - Traffic & Transportation
- Chapter 13 - Telecommunications & Aviation
- Chapter 14 - Shadow Flicker
- Chapter 15 - Biodiversity
- Chapter 16 - Major Accidents & Disasters
- Chapter 17 - Site Selection & Alternatives
- Chapter 18 - Interaction of the Foregoing
Volume 3 - Appendices
- Appendix 1.1 Project Team & Experience
- Appendix 1.2 Projects Considered in the Cumulative Assessment
- Appendix 2.1 Scoping Response
- Appendix 2.2 Scoping Report
- Appendix 2.3 Pre-Application Correspondence
- Appendix 2.4 Community Engagement Documents
- Appendix 3.1 Candidate Turbine Specifications
- Appendix 3.2 Construction Environmental Management Plan (CEMP)
- Appendix 3.3 Schedule of Mitigation Measures
- Appendix 3.4 Forestry Report
- Appendix 5.1 Residential Receptors within 1km of the Proposed Development
- Appendix 6.1 Carbon Calculator Vestas / Siemens & Input Data
- Appendix 7.1 LVIA Constraints and Options Considered
- Appendix 8.1 Geophysical Investigation Report
- Appendix 9.1 EU Directives, National Regulations, Guidelines, Technical Standards
- Appendix 9.2 Water Framework Directive
- Appendix 9.3 Flood Risk Assessment
- Appendix 9.4 Groundwater Sampling Field Record Sheets
- Appendix 9.5 Surface Water & Groundwater Quality Screening
- Appendix 9.6 Surface Water & Groundwater Laboratory Results
- Appendix 9.7 Borehole Logs
- Appendix 9.8 Rating of Existing Environment Significance / Sensitivity (IGI 2013 Guidelines)
- Appendix 9.9 Description of Effects (EPA 2022)
- Appendix 9.10 Classification of the Significance of Impacts (EPA, 2022)
- Appendix 10.1 Glossary of Terms
- Appendix 10.2 Baseline Survey Details
- Appendix 10.3 Graphs of Measured Background Noise
- Appendix 10.4 Derived Wind Farm Noise Limits
- Appendix 10.5 Assessment Against 2019 Draft Guidelines
- Appendix 10.6 Wind Speed Calculations
- Appendix 10.7 Calibration Certificates
- Appendix 11.1 Site Gazetteer
- Appendix 12.1 Turbine Delivery Report
- Appendix 12.2 Traffic Survey Data
- Appendix 12.3 Construction Traffic Management Plan (CTMP)
- Appendix 13.1 Scoping & Consultation Correspondence
- Appendix 13.2 2RN Protocol Agreement
- Appendix 14.1 Shadow Flicker Modelling Input Data Results by House/Window
- Appendix 14.2 Total Theoretical Shadow Flicker Shutdown Periods by Turbine – Scenario 1
- Appendix 14.3 Total Theoretical Shadow Flicker Shutdown Periods by Turbine – Scenario 2
- Appendix 15.1 County Development Plans & Biodiversity
- Appendix 15.2 Baseline Bird Reports
- Appendix 15.3 Baseline Bat Report
- Appendix 15.4 Aquatic Ecology Report
- Appendix 15.5 Terms for Impact Assessment
- Appendix 15.6 Designated Site Synopses
- Appendix 15.7 Desktop Data
- Appendix 15.8 Collision Risk Model
- Appendix 15.9 TDR Node Habitats
- Appendix 15.10 Natura Impact Statement
- Appendix 15.11 Habitat & Species Management Plan